About Wirral Driveways
A driveway and paving brand covering the Wirral peninsula, run as a main contractor.
How the work is actually organised
Wirral Driveways takes the job as main contractor and puts the labour and the plant on it. One person quotes it, one person is answerable for it, and you are not chasing a groundworker and a paviour separately to find out who is coming.
What you get is a written scope with the build up stated, a date, and somebody whose problem it is if the date moves.
We install. We do not clean
This matters enough to say on its own page. Cleaning, sealing and re-sanding an existing driveway is a genuine trade and it is not this one. It needs different equipment, different materials and a different way of pricing.
So we do not offer it, we do not quote for it, and when you ask we will point you at wirralexteriorcleaning.com, which does it properly. Saying yes to work we are not set up for would be the easy answer and the wrong one.
What else we will tell you we are not
Structural retaining walls above a modest height, anything involving a highway other than a straightforward vehicle crossing, and tree surgery on a protected tree are all other people's work. All three come up on driveway jobs and all three are worth bringing the right person in for.
No photographs of our work, and why the site says so
There are no job photographs on this site. The slots are placeholders and they are labelled as placeholders. Nothing here is a stock picture presented as a job and nothing is borrowed from another company.
Real ones go in as jobs are finished and customers are happy for us to use them. The same goes for anything that looks like a customer quote: there is a section built and ready, switched off, until there are real ones with permission attached.
How a job runs
- 1You send the details
Rough size, what is there now, and which way the ground falls. A photo from the pavement and one from the house is ideal.
- 2We come and look, and sometimes dig
Levels, access and where the water goes. On an unknown plot a trial hole takes an hour and saves an argument later.
- 3You get it in writing
Excavation depth, sub base type and thickness, edge restraint, surface and drainage, each as its own line.
- 4Dug, based, laid, cleared
Spoil away, sub base compacted in layers, surface laid, site left clean rather than left for you.
Tell us about the plot
Rough size, what is on it now and which way it falls is enough for a first answer about what is possible.
Get in touch
Tell us roughly how big the area is, what is on it now and which way it falls. A photograph from the pavement and one from the house answers most of it before anybody rings you back.
- Phone0151 453 8836
- Emailcontact@wirraldriveways.com
- WhatsAppSend us a photo of the job
- Based inWirral, Merseyside
- HoursMon to Fri 8 to 6, Sat 8 to 2, closed Sunday
